The Full Timeline (typically 8-14 weeks)
- Compliance pre-check (1-2 wks): confirm the market’s pathway and the device’s registration status — the first and most valuable filter (see market access).
- Quotation and contract (1-2 wks): standardized comparison, configuration, SLA and acceptance clauses.
- Payment: typical deposit-plus-balance; corporate accounts of the registered entity; LC for large deals.
- Production and pre-shipment inspection (2-6 wks): build time for non-stock models; third-party or video inspection possible.
- Shipping (1-3 wks): sea vs air; crate and shock requirements; insurance on CIF terms.
- Customs: medical devices usually need import permits/registration papers — missing documents are the biggest snag.
- Installation and acceptance (1-3 days): per contract standards (see acceptance), training alongside.