Buying FAQ: The Ten Must-Answer Device Questions

The Ten Musts

  1. Factory or trader? Core devices direct (the comparison).
  2. Acceptance testing? Energy measurement + stability + cooling (the flow).
  3. Consumable clauses? Price lists + supply years in contract (the entry).
  4. Service evaluation? Quantified SLAs + parts stock (the entry).
  5. Used units? Strict inspection + legal sourcing (the entry).
  6. Is imported always better? Compare specs and compliance, not origin (the evidence).
  7. Factory visit? Mandatory for core devices (the checklist).
  8. Budget split? Five-year TCO (the structure).
  9. Spotting inflated specs? Test conditions + third-party measurement (the guide).
  10. Why never white-label? Unregistered = no protection + self-carried liability (the entry).

More Top Questions

  1. Procurement lead time? In-stock 2-4 weeks; built-to-order 6-10 (the flow).
  2. Who pays for training? Basic is standard; advanced and annual refreshers go into contract (the costs).
  3. Rent before buying? Valid demand validation (the analysis).
  4. Payback period? Typically 12-24 months (the ROI).

When a Factory Audit Is Mandatory

Related Terms